As artificial intelligence continues to grow, so does the demand for high-powered, always-on data centers. These facilities require massive amounts of electricity to keep servers, cooling systems, and networking hardware running at peak performance. At ACWORKS®, we’re proud to provide the heavy-duty power solutions that keep these advanced operations online.

One of the most common configurations in modern data centers is 3-phase power, which delivers electricity more efficiently and balances the load across multiple circuits. That’s where our NEMA L22-20 and NEMA L22-30 extension cords come in.

NEMA L22-30 Extension Cords

  • Rating: 3Ø 277/480V, 30 Amp

  • Wiring: 3 hot, 1 neutral, + ground

  • Max Power: 24,912 Watts
  • Other Applications: Large HVAC systems, motors, and high-demand commercial equipment

The NEMA L22-30 is built to handle heavy loads in mission-critical environments. In AI data centers, it’s often used to power high-performance cooling systems and large-scale infrastructure, ensuring servers stay cool and uptime remains constant.

NEMA L22-20 Extension Cords

  • Rating: 3Ø 277/480V, 20 Amp

  • Wiring: 3 hot, 1 neutral, + ground

  • Max Power: 16,608 Watts
  • Other pplications: Data centers, lighting systems, high-voltage HVAC setups

The NEMA L22-20 is ideal for AI server racks and auxiliary systems where reliable, high-voltage power distribution is key. These cords ensure that the enormous energy demands of AI workloads can be met without disruption.

Why They’re Perfect for AI Data Centers

  • Efficiency: 3-phase power delivers electricity evenly, reducing wasted energy and lowering heat output.

  • Reliability: ACWORKS® cords are built with industrial-grade materials for consistent, long-term performance.

  • Scalability: As AI data centers expand, having the right extension cords ensures seamless integration of new systems.

Built for the Future

AI isn’t slowing down  and neither are the demands on the infrastructure that powers it. Choosing the right cords and connectors is just as important as choosing the right servers or cooling equipment. That’s why some of the largest Fortune 500 companies building next-generation AI data centers rely on ACWORKS®.

With ACWORKS® NEMA L22-20 and L22-30 extension cords, you get the power, durability, and peace of mind your data center deserves.

 

Leave a comment

Please note, comments need to be approved before they are published.

This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.

Latest Stories

View all

Powering the Future of AI Data Centers with ACWORKS Extension Cords

Powering the Future of AI Data Centers with ACWORKS Extension Cords

As artificial intelligence continues to grow, so does the demand for high-powered, always-on data centers. These facilities require massive amounts of electricity to keep servers, cooling systems, and networking hardware running at peak performance. At ACWORKS®, we’re proud to provide the...

Read more

Charge Anywhere: How AC WORKS® Supercharger Adapters Keep You Moving

Charge Anywhere: How AC WORKS® Supercharger Adapters Keep You Moving

Electric vehicles (EVs) have transformed the way we drive, but charging can still feel like a challenge. Different stations, different plugs, and limited access create range anxiety for drivers who just want to hit the road without worrying about where...

Read more

Can One Outlet Run Both 120V and 240V?

Can One Outlet Run Both 120V and 240V?

If you’ve ever looked at a dryer outlet or RV plug and wondered: can this outlet power both 240-volt and 120-volt devices? The answer is it depends. In this post, we’ll explain how these outlets work, why some are safe to...

Read more